Katy Trail Camping Trip Turns Bad

The Katy Trail is 200 plus miles and expanding.  A converted rail line turned into a trail for biking, running, and walking.  It is a great resource.  Over spring break my son-in-law and I decided to go camping. I mentioned that in my last post.   As it turned out the weather was horrible.  It rained, and stormed with lightning,  for days, without much of a break, and the weather was cold.  We scaled down our effort from 50 miles out to camp, and then riding back the same way, to just  25.  The weather report kept showing a break in the weather, but it never came.  Even the much less ambitious distance wasn’t possible for us.  We  had a tight schedule and we would not have been able to make it to our campsite before dark under the trail conditions, and get back on time.    We had to turn back without completing our trek.  What went wrong?

The surface of the trail, which I failed to get pictures of, was boggy and our speed was down to 7 mph or less.  And that with hard peddling.  I was in shape for the ride, having practiced with a fully loaded trailer, but it was a no go.  The combination of wet, despite pretty decent rain gear, the chill, and facing having to set  up camp in the dark under those conditions was too much for us.  So, here are some pictures of a the expedition that failed.  But, I am training to do it again.  The next obstacle?  Ticks.  I found my first this last Sunday.  Not from this jaunt, but from doing yard work.

Sunday Ride on the Katy Trail 

First long ride in my Surly Cross Check. After 17 years on my trusty Schwinn hybrid it was an adjustment, but things are looking up. From straight bars to drop bars will take awhile. A great bike, but the stock brakes on this 2009 bike are atrocious.  The new ones have brakes that are simply outstanding.  If anyone from Surly reads this please take pity and send me a replacement set!

On that ride my son in-law and I rode about 27 miles, roundtrip  from McBain heading West past the famous old railroad tunnel in the river town Rocheport.   Several miles outside of Rocheport we scouted a camping site before heading back.

We were on the Katy Trail.  A rails-to-trail project here in the Show-Me-State that runs over 240 miles parallel to the mighty Missouri.  From one end to the other, and it is the longest such project in the United States. I have hopes of riding the whole thing in 2017.

Here are some pictures I took along the route out.

This last picture below  is the state champion Burr Oak which is somewhere between 350 to 400 years old.  During the short while we were there the stately tree received nearly a dozen visitors.